Hello to All,
I have a Busway installed thru a hi-rise building (non splash proof)on a horizontal run that has several sections where the plumbing contractor and fire sprinkler contractor routed the conduits (coordination) above the busway, since this portion of the run is not splash proof, do you think they would have to reroute these or provided some type of protection.
Thanks in advance