FLORIDA BUILDING COMMISSION
JUNE 9, 2009 MEETING
SUMMARY REPORT
Major Business and Actions
Evaluate establishing a dialog with air conditioner manufacturers together with major local jurisdictions and insurance industry representatives regarding roof top equipment compliance with hurricane wind standards.
Rule Adoption Hearings on: Rule 9B-70.002 Education; Rule 9B-3.047 FBC Glitch Amendments including adoption of 2008 NEC, reference to “designers” in FBC, Building, chapter 1, DOH public pool standards update and other fixes; and, Rule 9B-13.0071 Cost Effectiveness of Energy Code Amendments. Rule Development Workshop on Product Approval system fees.
See the “Facilitator’s Report” and “Minutes” for further details.
Accessibility Code Waivers
See Attachment 1 for thumbnail summary
See the Accessibility Waivers attachment to “Facilitator’s Report” for details.
Product Approvals
See the Product Approval Summary Report attachment to “Facilitator’s Report” for details.
Code Interpretations/Declaratory Statements
See Attachment 2 for thumbnail summary
See the Legal Report attachment to “Facilitator’s Report” for details.
Workplan
See the Workplan attachment to “Facilitator’s Report”.
The “Facilitator’s Report” is located at:
http://www.dca.state.fl.us/fbc/commission/1_commission_meetings.htmNext Meeting of the Commission:
August 10, 11 & 12, 2009, Crowne Plaza Hotel, Melbourne, Florida
ATTACHMENT 1
SUMMARY REPORT
FLORIDA BUILDING COMMISSION
ACCESSIBILITY ADVISORY COUNCIL
June 8, 2009
Waivers from Accessibility Code Requirements
1. Muvico Theaters Cocowalk
Requirement: Vertical accessibility to all rows of seats in a stadium type movie theater.
Action: Deferred to August meeting at the request of the applicant.
2. United Way of the Big Bend.
Requirement: Vertical accessibility to the second floor of an office building.
Action: Recommended approval.
3. The Palms Hotel and Spa.
Requirement: Vertical accessibility to the front entrance of a historic building.
Action: Recommended approval.
4. Miami-Dade Fire Rescue Station #64
Requirement: Vertical accessibility to the second floor of a fire station an accessibility to firefighters’ toilet rooms.
Action: Deferred to August meeting for additional information.
5. New Emerald Coast Middle School.
Requirement: Vertical accessibility to all rows of seats in two bleachers in a gymnasium.
Action: Recommended approval, to include required companion seats.
6. The Urbana Retail Tenant Building.
Requirement: Vertical accessibility to open air rooftop parking.
Action: Deferred to August meeting to present new information to the Advisory Council.
7. Winter Haven Fire Safety Complex.
Requirement: Vertical accessibility to the second floor of a fire station and accessibility to firefighters’ toilet rooms.
Action: Deferred to August meeting for additional information.
8. Island Water Sports.
Requirement: Vertical accessibility to a second floor storage area in a retail facility.
Action: Recommended approval.
9. Dick Brown Park – Dave Manzo Field
Requirement: Vertical accessibility to all rows of seats in two bleacher systems at a baseball field.
Action: Deferred to August meeting for additional information.
ATTACHMENT 2
SUMMARY REPORT
CODE INTERPRETATIONS BY DECLARATORY STATEMENT April 7, 2009
See Legal Report attachment to “Facilitator’s Report” for details at
http://www.dca.state.fl.us/fbc/commission/1_commission_meetings.htmSECOND HEARINGS - FINAL
DCA08-DEC-207 by Anthony Apfelbeck, Fire Marshall/Building Official, City of Altamonte Springs – CO detectors. Action: Final
DCA09-DEC-009 by Thomas H Ford of Bhamani, Ford - Small storage space ventilation. Action: Final
DCA09-DEC-025 by Brad Wetherholtz, Florida Roofing and Sheet Metal Association – Mitigation/retrofit diameter of 8d common nails for roof decking. Action: Final
DCA09-DEC-045 by Brad Wetherholtz, Florida Roofing and Sheet Metal Association – Mitigation/retrofit when roof covering is replaced. Action: Final
DCA09-DEC-053 by James R. Schock City of Jacksonville – Mitigation/retrofit with opening protection for house valued greater than $750,000. Action: Final
DCA09-DEC-062 by Dan Arlington, St. Johns County – Mitigation/retrofit required for all buildings or residential only. Action: Final
FIRST HEARINGS
DCA09-DEC-069 by Michael Huddy of Barrier Technology Corporation. Action: Withdrawn
DCA09-DEC-115 by Mary Mead. Action: Dismissed
DCA09-DEC-119 by Emil Veksenfeld. Action: Dismissed
DCA09-DEC-121 by Robert Dunn of Collier County Building Department – Permits required for water heater replacement. Action: To Second Hearing
DCA09-DEC-129 by Rodger England of Bermuda Roof Co., Inc. (Deferred) – Use of premixed mortar for roof tiles in HVHZ. Action: To Second Hearing
DCA09-DEC-130 by James Schock P.E. of Building Inspection Division of City of Jacksonville – Single toilet room for small restaurant. Action: To Second Hearing
DCA09-DEC-138 by Nick D'Andrea City of Tampa – Classification of training room as Group A or Group B. Action: To Second Hearing
DCA09-DEC-139 by David G. Karins, P.E. of Karins Engineering Group, Inc. – Use of test reports past their expiration dates for state Product Approval. Action: To Second Hearing
Thank you
Rick Dixon
Codes and Standards
850-487-1824