MENU
Florida Chapter Officers
BOD Chairman
Dan Prater
President
Ted Licitra
1st Vice President
Mark Deegan
2nd Vice President
Richard Wheelus
3rd Vice President
Vince Dellacroce
Chaplain
James Douglas
Secretary
Joe DuPriest
Treasurer
Eric L Wasser
Parliamentarian
Tim Wright
Who's Online
0 registered (), 4 Guests and 16 Spiders online.
Key: Admin, Global Mod, Mod
Newest Members
ddasa, mcfs509, Spike, dsf, Christoper
519 Registered Users
Top Posters (30 Days)
Nick Sasso 5
Bryan Holland 5
Heinz R. 2
TerryR 1
Mike Timpanaro 1
Google Search
Today's Birthdays
No Birthdays
Page 2 of 2 < 1 2
Topic Options
Rate This Topic
#8583 - 11/15/11 07:12 PM Re: Solar Farm [Re: ]
Nick Sasso Offline

Post-A-Holic Member
****

Registered: 11/08/01
Posts: 1451
Loc: West Palm Beach
Originally Posted By: gfretwell
Are you calling it a classified location?


no.
_________________________

Top
#8584 - 11/17/11 11:06 AM Re: Solar Farm [Re: Nick Sasso]
Bryan Holland Offline

Secretary
*****

Registered: 10/05/04
Posts: 1622
Loc: City of North Port
I may be confused, but it seems to me that once the PV - DC supply is converted to AC and hits the first means of disconnect, it now beomes normal premises wiring and thus meet general rules of conductor overcurrent protection.

I guess I am having a hard time to understanding the installtion as described.
_________________________
Bryan P. Holland, MCP

Top
#8585 - 11/17/11 11:20 AM Re: Solar Farm [Re: Nick Sasso]
Nick Sasso Offline

Post-A-Holic Member
****

Registered: 11/08/01
Posts: 1451
Loc: West Palm Beach
I'm sure that I'm confused. If possible, I will post a pdf of the one-line diagram, or at least some of it. It may take me a day or so.
_________________________

Top
#8586 - 11/17/11 01:54 PM Re: Solar Farm [Re: Nick Sasso]
Ruben Rocha Offline
Senior Member
*****

Registered: 05/24/00
Posts: 767
Well the cells are dc and there is a current limit on the cells.
So if the limit of the cells is say 100amps, that is all they provide. Period.
Kinda like a generator rating. If you have say a 500kva generator. Then above that rating if the load calls for it . pretty much the generator will stall or reduce its voltage because it can't keep up with the load.

My 2 cents.

Top
#8609 - 12/05/11 08:33 AM Re: Solar Farm [Re: Nick Sasso]
COTInspector Offline
Mechanic Member
*****

Registered: 02/14/08
Posts: 132
Loc: Tampa, Florida
Am I to late to give my 2 cents worth?

Nick, I have a couple of questions.
Is this an Utility interactive system?
Are there overcurrent protection devices in the "collector box or boxes" on the AC side of the inverters?

I agree with Byran a PV system does not fall under the NEC definition of service, so what do we call them??

Some PV contractors tell me that the are appliances what say you guys on that point?

I was taught that when dealing with PV systems you have to think backwards.

So if indeed this is an utility interactive system, as soon as the utility power is taken away (been told within 6/10 of one cycle) the inverters stop the AC output.

The overcurrent proctection devices located in the collector box or boxes will "limit" the current that can be placed on the 600 foot "feeder" conductors.

If there is a ground fault or short circuit in the "feeder" the fuses in the 800 amp disconnect will open (this is where the backward thinking comes in) and the inverters will stop producing AC power.

The PV panels would still be producing DC power and the DC side of the inverters will still be energized, but no danger would be present.

IMHO
Neal Burdick
City of Tampa
Construction Inspector II

Top
#8610 - 12/05/11 09:27 AM Re: Solar Farm [Re: COTInspector]
Nick Sasso Offline

Post-A-Holic Member
****

Registered: 11/08/01
Posts: 1451
Loc: West Palm Beach
Originally Posted By: COTInspector
Am I to late to give my 2 cents worth?


Never too late, Neal.

Originally Posted By: COTInspector
Nick, I have a couple of questions.
Is this an Utility interactive system?


To the best of my knowledge - yes it is.

Originally Posted By: COTInspector
Are there overcurrent protection devices in the "collector box or boxes" on the AC side of the inverters?


I'm not sure. Will have to check into that.

Originally Posted By: COTInspector
I agree with Byran a PV system does not fall under the NEC definition of service, so what do we call them??


A big pain in my butt? (just kidding) I'm pressed for time lately. I have been meaning to post a sketch and will try to do so this week...

Thanks!
_________________________

Top
Page 2 of 2 < 1 2



Active Topics
May Meeting Minutes
by Bryan Holland
05/17/12 02:05 PM
May Meeting Announcement
by Bryan Holland
05/08/12 07:58 AM
Visual Alarms
by Nick Sasso
05/02/12 03:55 PM
Nonmetallic Extensions
by Nick Sasso
04/25/12 03:33 PM
Selective Coordination of Circuit Breakers
by Heinz R.
04/24/12 05:03 PM
May
M Tu W Th F Sa Su
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
Featured Member
JBD
JBD
Registered: 03/20/10
Posts: 0
Forum Stats
519 Members
29 Forums
1892 Topics
8569 Posts

Max Online: 53 @ 03/30/12 04:16 PM
Uploaded Pictures
Can You Spot The Electrical Violation?
1948 Signalite Fuse
Portable Generator Grounding
2011 Florida Gulf Coast Division - Seminar
Knob and tube in industrial application
1920's Duplex Radio Outlet
Random Gallery Image